F A Q |
1 Q. Do we have access to a section and photographs of the interior of the Central Building in order to be able to determine the internal structure and to verify the heights?
A. All of the possible documentation is provided in the CD as distributed to the competition participants. The sections effectively correspond to the elevations whereby the pilasters as shown hold up the roof and the walls of 40cm.
2. Q. Are the programmatic requirements included
as part of the competition brief, or will they be sent separately?
A. The programmatic requirements, if in reference to the economic-financial analysis of the construction, maintenance and management costs, is included in the competition brief as given, and is required for the successful submission of the competition entry.
3. Q. Would it be possible to have an estimate of
the number of visitors expected for the new Central Building?
A. No estimate was provided in the competition brief, it would in part depend on the development of each of the competitor's proposals.
4. Q. Is the service station included in the site
of intervention expected to be demolished?
A. The service station could be demolished if it were to be proposed in the submitted competition entry.
5. Q. What are the building rules and regulations
for the competition area? (buildable areas, restrictions on ground floor
coverage, setbacks and min. distances from property lines)
A. The building rules and regulations would be defined in accordance with the development of the proposed projects. The only restrictions and building limitations are those already provided in the competition brief.
6. Q. Are there plans for a site-visit?
A. A site-visit is scheduled for either May 31st or for June 7th. A confirmation of the date and times will be forwarded via email.
7. Q. In the application
for the competition, the dates of professional registration are requested
for the participating consultants and collaborators. Is this a restriction,
or can other professionals be included as collaborators?
A. The consultants and collaborators are not required
to be registered professionals, and other kinds of professionals can also be
included as collaborators.
8. Q. In section 4.12 of the competition brief, in reference
to the public financing, the PIT Sele contribution is listed as 7.7 million
Euro. Is this given sum a total that is to be divided up for the financing of
A. No, this money is not
subject to other divisions. It should be noted that this number is an estimate
and that other funds including private sources could be pursued. 9. Q. Is the
fee of 75 Euro the cost for inscribing in the competition, or is it only the
fee for the receipt of the CD? If this is the case, is it possible to download
the CD contents from the internet site?
A. The 75 Euro inscription fee is obligatory and is
payable as outlined in the competition brief. Failure to deposit funds as
indicated results in the exclusion from the competition. The CD Rom is slightly
different from, and more complete than, the information provided in the official
website. 10. Q. Considering the A1 format and the required 1:200 scale of the requested
plans, sections and elevations of the Town Hall, the Council Hall, and the
South buildings, the fourth presentation sheet is almost impossible. It would
be helpful to have either a larger presentation format, or a different scale
for the required drawings.
A. The presentation format size is fixed (A1 format). Only if necessary should
some of the drawings for the fourth sheet, and possibly for the other sheets,
be reduced to a scale of 1:500. 11. Q. How is it possible to fulfill the given requirements of the "Board.
4-New City Offices, and Council Hall + South Buildings. For each: plan, elevation,
section, scale 1:200" without having been provided with the sections
of the buildings and the South Buildings. A. Please refer to the previous answer (10). For the South buildings,
no further documentation will be provided. This could in part be in light
of the fact that these buildings may be demolished and rebuilt.. 12. Q. Would it be possible to include underground
parking in the areas listed as A-B-C-D? A. Yes. 13. Q. Please confirm and verify the following mode
of inscription: A. Yes, this configuration fulfills the requirements of an individual
working with a number of collaborators; however, it does not fulfill the
requirements of a design group unless one of the professionals has been
registered within the past 5 years. 14. Q. Having been hired by the Fondazione Arkè
for a feasibility study of the area included as the competition site, does
this involvement exclude my participation from the competition? A. No. It is possible to participate in the competition. 15. Q. Where is the demolition and rebuilding of the
buildings foreseen? Is it obligatory to maintain the existing profiles or
is a comparable volume possible? A. No, it is not absolutely obligatory to keep the existing seat, but
it seems useful to maintain the profiles even though, I repeat, it is not
obligatory. These would be considerations that the jury would evaluate. 16. Q. Would it be possible to visit the building? A. The competition site itself is open to the public; the small piazzas
are actually currently used as public parking-lots. It is not possible however
to enter into the buildings, partly due to the condition in which they are
found. 17. Q. Would it be possible to include the South building
as listed for presentation on the fourth presentation board in the fifth,
and as a result, re-distributing the required images throughout all of the
boards? A. No, it is not permitted. Refer to question 10 for alternative solutions. 18. Q. Could an approximation of the number of apartments,
or an estimate of how many people might occupy the South Buildings be provided? A. No, no estimate is available. This question is directly linked to the
individual competition projects and to how the functions and management
of the facilities are foreseen by the designers themselves. 19. Q. After having taken into considered the competition
brief, the area, and the vision as outlined in the brief, we are led to believe
that the commercial and residential zone, the bookshop, nursery, etc. would
be more appropriately located in the East Building rather than the Central
Building as stipulated in the brief. Would such a variation be taken into
consideration, or should one be careful to rigorously follow the brief? A. Yes, but the definitive considerations would be taken by the jury in
respect to each project. 20. Q. In addition to the requirements as listed, would
it be possible to include other materials in presentation Board 5 (for example
in Board 1: in addition to the site plan at a scale of 1:500, a site section
of 1:500; Project Board 2: in addition to plan, section and elevations at
1:200, also construction details or mechanical/technical plans)? A. Yes, as long as those drawings requested are presented. 21. Q. Would it be possible for the participants to
have a site plan of the area of intervention with the surrounding building
heights? 22. Q. Are the heights provided in the brief for both
the existing buildings and those slated for re-use indicative of the height
from the ground up to the bottom edges of the roof-line? A. Yes. 23. Q. Would it be possible (and appropriate) to consult
the master-plan (PRG) for those areas and attendant buildings included in
the site of intervention? A. No, it is not necessary (see question 5). They are in any case available
for consultation and reference at the City's website. 24. Q. Would it be possible to locate the required
parking areas underground, beneath the free/open areas? A. Yes. 25. Q. How many people should the housing accommodate? A. It depends on the project. 26. Q. In reference to paragraph 4.4 of the competition
brief, is it required to maintain the façade of the Central building
(n°1) in testimony of its industrial history, or is it possible to reuse
only the concrete, load-bearing structure? 27. Q. As described in paragraph
4.5 of the competition brief, do the listed programmatic requirements for
the Arké Foundation apply only to the Eastern side building (n°2)-for
which the City has negotiated a free lease-or do they also apply to the Northern
side building (n°2)? A. It depends on the design
proposal. In an effort to clarify the competition brief and the given site
plan, the lease negotiated with the Arké Foundation was for the building
due north of the central building because of its similar typological connotations,
and not for the other building because it has been slated to be demolished
and rebuilt. 28. Q. For the three existing buildings on the south
side, as discussed in paragraph 4.6 of the competition brief, what is intended
by the word "reconstructed"; do the new buildings need to follow
the outlines of the footprints of the buildings that once existed? A. Yes. Please refer also to the preceding questions? ____________________________________________________________ A. Q. Is it possible to add other designers into the
group? A. Yes, as long as their involvement is communicated before the end of the
inscription period-June 30th-and in turn confirmed in the requested documentation
to be included in the closed envelope. B. Q. Are there archeological restrictions for the
open spaces? A. No. Q. Are underground spaces permitted? A. Yes. C. Q. Does the agreement between the Arké Foundation
and the City apply only to the Eastern side buildings and its own functions? A. Yes. Q. Is it is possible to include functions other than
those of the Foundation's in the Eastern buildings? A. Yes. Q. Can some of the functions for the Foundation be
located in the North building? A. Preferably no. Q. Are public porticoes allowed? A. Yes. D. Q. For the North building (n°3), is it required
to follow the planametric and elevational profiles of the pre- existing buildings? A. It is permitted to work with the given heights. See question 15.. Q. In the event that old buildings are replaced with
new ones, do the seismic rules and regulations of minimum distances still
apply? What is the minimum distance from the borders of the site? A. Given that this is a renewal project, it is possible to override the seismic
requirements of minimum distances while still foreseeing the provision of
seismically resistant structures. E. Q. What are the restrictions for the preservation
of the Industrial Buildings (n°1 and n°2)? Can the facades be modified,
can the roof have a different form, can the structural grid be modified by
eliminating some of the pilasters, can an underground level be excavated,
can mezzanine levels be introduced, can part of the structure be demolished? A. The façades cannot be changed, both the roof and the structural
grid can be modified and/or eliminated, new underground areas are permitted
as well as are new mezzanine levels, but the façades must remain intact.
See question 26. F. Q. Are the total area requirements to be determined
by the participants in Buildings 1,2 and 3? For example, in Building 2, can
independent functions such as mezzanine levels, courtyards, and so forth be
added to the stated programmatic requirements of the given buildings (such
as for the Town Hall, the Council Hall, etc., or even other programmatic functions
suggested by the participants)? A. Yes. G. Q. The volumetric allowances as given by the PRG
are decidedly lower than the volumes of the existing buildings 1,2 and 3.
What is more important, to maintain the profiles of the existing buildings,
or to adhere to the PRG volumetric allowances? A. The volume of the existing
structures is the allowable volume. H. Q. Can external stairs, open/closed pedestrian bridges,
covered walkways, and subtractive or additive porticoes be included in the
proposal? A. Yes. I. Q. Does the 10.5m height restriction in the welcome
center buildings include stairs, small towers, parapets, technical rooms,
solarium and such? A. No, it does not include such elements. J. Q. The brief requests a total of 100,000 square
meters. National parking codes require around 10,000 square meters of private
parking in addition to another 40 square meters of parking for every 100 square
meters commercial and retain space. Given that the Town Hall has a 400 parking-space
requirement, does this mean that parking will be located in other areas in
order to satisfy national parking codes? A. Yes, because the intervention is a renewal project. K. Q. Would it be possible to add the welcome center
parking lots to other parking areas, which would mean locating them in another
parcel of the PRG? A. No. L. Q. Are the parking lot requirements for the Town
Hall in regulation with, and sufficient for not only parking codes, but also
for the 1,500 square meter addition and Council Hall? Can these parking spaces
be added to other parking areas? A. Yes. M. Q. Are surveyors permitted to participate in a group
comprised of architects? A. As consultants and/or collaborators. N. Q. Is it required to include an image of a model
in the presentation Board 5, and should the other requirements be interpreted
as indicative? A. These requirements are indicative, however only three dimensional representations
can be included in Board 5. O. Q. Will all of the projects be included in the publication,
or only a few of them? A. It depends on the number of participants and the quality of the proposals.
Those awarded citations and prizes will definitely be included. P. Q. Can the required parking be located underground? A. Yes. Q. Q. Does the existing cubic volume of the existing
buildings slated for preservation need to be observed in addition to the profiles
of the buildings? A. The existing cubic volumes must be respected. See question 15: R. Q. Is documentation of future infrastructural and
transportation systems (metro and airport) within the city limits available? A. No. S. Q. Can the site be visited? When? A. Yes, the site is open to the public (open spaces). A site visit is scheduled
for the participants on June 7th. T. Q. Are there budgetary limits for the project? A. No. The designer should take into account that the projected public funds
will be augmented by other funding sources, and that the budget indicated
in the brief will be held accountable. U. Q. In the event that the existing South Building
will be maintained, would documentation of the existing condition be available? A. No, at this time the structures are inaccessible and therefore cannot
be documented. V. Q. Is the North Building also slated to house some
of the Arké Foundation functions like the East Building? A. No. W. Q. Does the free-lease agreement with the Arké
Foundation also include the North Building? A. No. X. Q. What are the restrictions-volumetric, min. distances,
planametric and heights-for the new buildings and the buildings that can be
demolished and rebuilt (South and North Buildings)? A. Those provided in the brief with the volumetric recovery. Y. Q. Can the existing gas pump at the East Piazza
on via Europa be demolished? A. Yes. Z. Central Building, Paragraph 4.4 Q. a) What is the total square meter requirement for
the Central building, and what is the break-down of this square meter requirement? A. Refer to the square meter requirements provided in the brief. No further
square meter requirements are given other than those listed in the brief. Q. b) Laboratories for Artistic Productions: Do the
activities of the constituent artistic components (music, film, and theatre,
etc.) need to occur simultaneously and therefore separated or can the occur
in one large space? A. It depends on the project. Q. c) In reference to the "spaces reserved for
associations and services," what are their individual needs and spatial
requirements? A. The end-users are as of yet unknown, and therefore so are their respective,
individual requirements. Q. d) These cultural spaces are for how many people? A. We do not know, it depends on the project. Q. a) How many apartments are requested, and what are
the square meter and volumetric requirements? A. It depends on the project. Q. b) What is the required proportion of commercial
space to building complex? A. It depends on the project. General: A. Yes. Q. b) Do the facades of the big buildings need to be
entirely maintained? A. Yes, for the Central building and for the Arké Foundation. AA. Q. Do those participating as consultants and collaborators
have to be professionally registered? A. Only those participants and those groups under whose name(s) the competition
entry has been inscribed under need to be professionally registered, but consultants
and collaborators do not need to be. BB. Q. Could further clarification of the parameters
of transformation and modification for the Central building be provided? A. See other answers, although these are individual design decisions. CC. Q. As stated in the brief, some buildings may be
demolished and rebuilt. Is it necessary to maintain the existing volume and
footprint, or can they at least be repositioned and re-shaped while keeping
the volume unaltered? A. It is not necessary, see other answers. DD. Q. Do the new structures
slated for the open area C have to follow the profiles of the pre-existing
buildings, or do other restrictions apply? A. No, there are no restrictions. EE. Q. Are there specific volumetric requirements for
open space A and the integration of the new Town Hall? A. No, there are no restrictions. FF. Q. How many floors are there in the Central Building,
and what is the allowable maximum height? A. It has only one floor taking up the height of the entire building. GG. Q. Can the load-bearing structure be modified (the
6x6 grid)? A. Yes. HH. Q. Are the total, various square meter requirements
at the discretion of the participants, seeing that they have not been included
in the brief? A. Yes. II. Q. The programmatic functions of the North building
were not specified (only that the East building is to house the Arké
Foundation). A. Refer to the general programmatic function destined fro the complex and
for what seems necessary for the design of the entire area. JJ. Q. Although the demolition of construction of buildings
has been foreseen, the maximum heights have not been given. A. See the last line of paragraph 4.6 KK. Q. It is not clear whether or not one should intervene
in the internal programmatic distribution of the actual Town Hall building
given the request to transfer the existing Technical Office and the Urban
Planning Sector to another location. A. No. LL. Q. Does the parking have to be covered or uncovered?
Can there be underground parking? A. Yes. MM. Q. (Paragraph 4.1) In terms of the culture, archeology,
and tourism, what are the most important buildings for the given program and
site? A. They are all those cited in that paragraph. NN. Q. (Paragraph 4.2) Were the entrepreneurs who introduced
the cultivation of tobacco at the end of the 20's local individuals? A. Yes. Q. Is the peronospera tabacchicina,
the disease that destroyed the cultivation of tobacco in the 70's the only
cause that brought an end to business activity in the short span of 50 years,
an activity that had 150 full-time employees and 2,500 seasonal workers? A. It was the main cause, in conjunction with a number of general social
and economic changes. OO. Q. - (Paragraph 4.3) Would it be possible to have
access to the programmatic functions developed by the City administration
in collaboration with the Province of Salerno, Salerno University, and the
Patto Sele Picentini? A. All of the necessary information and indications
have been already been synthesized into the brief. Additional documentation
is unfortunately unavailable to the participants. PP. Q. (Paragraph 3.4) Could more details be provided
for the minimum materials required for the (5) A1 presentation boards in regards
to each individual building (which elevations and sections)? A. These are at the discretion of the designers. QQ. Q. (Paragraph 4.4) Does the possible modification
of the Central building's roof include also its partial or total definition,
and even a completely new roof? A. Yes. RR. Q. Can a more detailed description of the programmatic
functions of the center be provided in terms of minimum surface areas, or
weighted percentages? A. No, these would be provisions given by each of the individual projects.
What needs to be respected are the minimum requirements as expressly stated
in the brief or the programmatic functions as already listed. SS. Q. Is the existing structure of concrete, load-bearing
columns able to support loads in addition to the roof? Q. Or in the event of additional floors, would an independent
structure be necessary? A. Additional structural elements would be needed in conjunction with, or
in the place of, the existing structure. TT. Q. Does the required parking (150 cars, 5 busses)
need to be above ground, or can they be partially/completely underground? A. Underground parking is permitted. UU. Q. Can the exhibition areas for the Arké
Foundation be on more than one level? A. Yes. The can be designed on more than one level. VV. Q. Is there a maximum/minimum, required dimensions,
or particular types of units for the young people's studios and mini-apartments?
Are there particular requirements for the common and service spaces? A. No. WW. Q. (Paragraph 4.7) Is the given c. 1,500 square
meter (allotted for the new offices) a gross figure of paved area, or is it
a figure to which additional functions are added (i.e. building + related
outdoor areas)? A. It is the gross surface area. XX. Q. Would it be possible to have either the programmatic
diagram/organizational scheme for the Technical Office or other relative information
useful for the dimensioning of these buildings? A. Two areas of the Technical Office have been provided (between functionaries,
technical instructors, administrative personnel, public service workers and
general workers/laborers) to eventually reach around 40 employees with projected
growth. Maximum liberty is given to the designers for the various possible
solutions. YY. Q. Are there particular suggestions/requirements
for the various connections both covered and underground? A. No. ZZ. Q. (Paragraph 4.8) In the open area on via Europe
(c. 1,500 square meters), would it be possible to demolish the service station
and to construct a limited number of volumes that could help integrate the
complex with the urban fabric? A. Yes. AAA. Q. If a qualifying participant (registered architect)
would like to participate in the competition as an individual, how should
the competition application be completed? Would the participant complete the
information under the title of "Team Leader" as well as under the
title of "Group Participants" as a member of the group? A. It would be completed under Team Leader. BBB. Q. Is it possible to list a number of consultants
and collaborators under the title"Consultants and Collaborators",
if the competition has been registered for by an individual? Otherwise is
it required that this individual inscribes as a group into the competition,
which in turn obligates the participation of someone to have been registered
in the past 5 years to partake in the group? A. As an individual no other participants are required. CCC. Q. Would it still be possible to receive the CD-Rom
containing the competition materials although the deadline for the CD mailing
has passed (April 30th, 2003), of course at the cost of the participant? A. Yes. The CD-Rom will be mailed to all of the participants at the site
visit scheduled for June 7th, 2003. DDD. Q. (Paragraph 3.3) In regards to the submission
of materials "(
) of an opaque sealed package that will include
(
)", how does the package need to be sealed, with stamped wax? A. Not necessarily. EEE. Q. In regards to "(
) and an economic-financial
analysis of the construction, maintenance and management strategies and costs."
-Does this mean that the participant must indicate a timetable of the construction
phase of the "Former Centola Tobacco Factory"? When providing these
cost estimates, does the participant need to take into account also furniture
and internal finishing costs for all of the constituent functions of the complex?
-Does this mean that the participant needs to innumerate all of the managerial
costs for the buildings and all of the associated, projected activities, both
public and private? A. Yes, all of this. FFF. Q. Do the privately funded functions / activities
need to be included partially or completely in the maintenance and management
costs of the buildings? A. Yes. GGG. Q. Do the privately funded functions / activities
also cover the costs of the management expenses incurred by the public activities? A. Not necessarily. HHH. Q. Board 2, Central Building: can more sections
of the buildings be presented? A. Yes. Q. Or do we have to restrict ourselves to the presentation
of only one sectional drawing as indicated in the brief? A. The brief contains the minimum requirements. III. Q. Where is the new metro station for the City
of Pontecagnano Faiano, soon to be constructed, located? A. Near to the railway station in proximity to the competition site area. JJJ. Q. Would it be possible to have documentation
of the new Metro Station's route in and around the city? A. Unfortunately no, this information is unavailable. KKK. Q. Where on the Picentino coast is the new tourist
port expected to be located? A. It will be located approximately mid-coast of the city limits, close to
the mouth of the river Asa around 7km from the competition area. LLL. Q. Would it be possible to have more detailed
information on the new National Archeological Museum of Agro Picentino? (site
plan, service roads, activities, etc.) Would it be possible to have more detailed
information of the Etruscan-Greek-Countryside Archeological Park? (site plan,
service roads, activities, etc.)? A. No. The necessary information has been synthesized in the competition
brief. MMM. Q. Would it be possible to increase the walkable
surface areas of the Central Building? For example A. Yes. NNN. Q. Would it be possible to modify the volume of
the Central Building (enlarging it), while clearly maintaining the 4 facades
unaltered? A. In any case, the maximum heights must be maintained. OOO. Q. Is the reinforced concrete, load-bearing structure
of the roof restricted? A. No. Q. The substitution or modification of the roof may
incur the demolition-also simply the partial demolition--of the 6x6 module
that comprises the entire plan structure of the Central Building. [Would this
be permitted]? A. Yes. PPP. Q. In regards to "areas for the memory and
local identity
", does this function specified for the Central Building,
refer to the permanent exhibitions/museums of the history and geography of
the area? A. Yes. Q. Regarding the "Laboratories for Artistic Production
",
does this function as specified for the Central Building, refer to the habitable
spaces and workshops for the students, young people, and citizens with the
possibility for small theatrical productions, etc
? A. The designers are free to interpret these functions as they wish within
the given parameters. QQQ. Q. For the North Building (n°3), no programmatic
function has been nominated; would it be possible to include some of the functions
of the Arké Foundation? A. Preferably not. Q.
or do the Arké Foundation programs
need to be necessarily contained only in the East Building (n°2)? A. The agreement with the Arké Foundation is holds only for building
no. 2. RRR. Q. Would it be possible to locate some of the
Central Building in the North Building (n°3), such as the "Spaces
reserved for associations and services" or the spaces of the "Urban
Center"? A. Yes. SSS. Q. If the North Building (n°3) is demolished,
does it necessarily have to be rebuilt? A. No. Q. Could one not have any new structure built on the
site of the demolished building? A. Yes. Q.
and in doing so, leaving this area open to
comprise part of the new system of open areas around the new European Center
for Emerging Creativity? A. All of these possibilities are left up to the designer. TTT. Q. Do the 50 parking spaces allotted in the brief
for the East Building (n°2-Arké Foundation) need to be separate
(in terms of space), from the large parking lot of the Central Building? A. No. Q. Or can they be located adjacent to, or nearby the
large parking lot with signage that distinguishes the two? A. Yes Q. Would it be possible to have an underground parking
underneath the open spaces of the former Tobacco Factory complex? A. Yes. UUU. Q. No specific documentation (plans, sections,
etc.) of the South Buildings (n°4, n°5, n°6) has been provided.
In order to better understand the internal organization of these buildings,
would it be possible to receive drawings of the existing conditions for these
buildings? A. Unfortunately no. This documentation is unavailable, and the buildings
are inaccessible. VVV. Q. Where is Centola street located? A. Centola street is the peripheral street located to the South which gives
access to buildings 4,5,6. WWW. Q. In the event that the South buildings are demolished
and rebuilt, would it be possible to augment the cubic volume of the new buildings
replacing them? A. Preferably no. XXX. Q. Does the max. height of 10.5 meter refer to
the height from the ground to the bottom edges of the roof (at the scuppers),
or to the pitch of the roof? A. To the bottom edges. YYY. Q. Do the 100 parking spaces that service the
new and existing function have to be necessarily separate, and away from the
big parking lot of the Central Building? A. No. ZZZ. Q. No mention of the gas station Fina is included
in the given information, other than the photographic views; is it possible
to move this gas station to another location within the city? A. Yes. Q. Or does the development of the project need to take
into account that the gas station remains? A. Absolutely not. The gas station will be eliminated from the area. AAAA. Q. Does a hydrology and geological study have
to submitted for the buildings that fall within the area A. No. BBBB. Q. Would it be possible to receive a copy of
the transcription of the public forum "Ideas for the new Centola: course
to follow for the International Design Competition"? Would it be possible
to receive more detailed information for the "C.E.C.E." and the
PIT Sele? A. No. This information has been synthesized in the competition brief. CCCC. Q. Would it be possible to have a site visit? A. Yes. The open areas are always accessible to the public as are the public
parking lots and when illuminated at night, the inside of the factory buildings
are visible. A site visit is planned for June 7th, 2003. DDDD. Q. Could you clarify what is meant by the special
prizes for the participants under the age of 36- does the whole group have
to be under 36 to qualify or only the group leader, or even only one member
of that group? A. See question 16. EEEE. Q. Would it be possible to have a larger map
of the area that includes Salerno and even the highway? A. No. For questions write to:
various other projects as well?
It seems as though the space available to represent these drawings is not
enough. Would it be possible to at least have the generic sections of the
central warehouse building?
In the Central building (n°1) where the roof is slated to be replaced,
would it be possible to alter the load-bearing structure while leaving the
building envelope unchanged?
Given the called redefinition of the piazza located at via Europa, would it
be possible to propose another location for the existing service area?
Is area 'A', namely the connection between the existing Town Hall and that
of the proposed Technical Office and Urban Planning Sector, subject to flooding
or issues pertaining to alluvial water plains as evidenced in the brief? Could
this connection in any case be hypothetically located underground?
"International Design Competition for the Former Centola Tobacco Factory"
comprised of the following individuals: "Dr. Arch. Xxxxxx, Registered
Architect-participant. Dott. Xxxxxx, Junior Engineer-Collaborator. Dr. xxxxxx,
Construction Engineer-Collaborator. Graduate Student xxxxxx, Engineering-Collaborator.
In order to satisfy the stipulated young designer requirement in terms of
the 36 years or younger age, do all of the constituent members of the group
have to be less than 36 years old?
The rules of participation in the competition are clearly stated in the
brief; it does not refer to age, but rather to the time-frame starting from
the date of professional registration/licensure (less than 5 years). In
the event that the group is comprised of individuals entirely under the
age of 36, the group as a whole must satisfy the given stipulations.
A. Unfortunately no, it is not available. In any case,
the buildings to the south and east are around 12 meters high. Those to the
north are around 22 meters high.
Do the mini-apartments need to have kitchens?
Are the Central Building's spaces for Memory (which include the objects and
materials to be exhibited and organized by the given theme) intended to be
developed by way of an accompanying system of information panels along its
circulation route?
A. The facades are to be conserved, as is the load-bearing structure. However,
the central columns that support only the roof, rising up to create a forest
of columns, may be maintained or eliminated at the discretion of the individual
designer.
South Building, Paragraph 4.6:
Q. a) Can the parking be located underground?
- (Paragraph 4.11) Would it be possible to have access to the transcription
of the public forum "Ideas for the new Centola: course to follow for
the International Design Competition"?
- What are the characteristics and final results of the cultural decisions
taken by the agricultural sector and the monti picentini that the City adhered
to in the deliberation of C.C. n. 55/2001?
- What are the general strategic indications contained in the PIT of the Piana
del Sele that the European Center for Emerging Creativity needs to take into
consideration?
towards the new construction via an new, intermediate level?
What is intended by the phrase the "Collection of youth culture"-permanent
or temporary exhibition spaces, video production labs, advertising/publicity
labs, or other functions?
Regarding the "Urban Center" (also to be included in the Central
Building) does this mean a sort of information booth, or could it include
limited areas of small, possible exhibition spaces where urban, economic,
touristic and cultural endeavors of the area could be communicated?
at risk of flooding?